Our Stormwater Drainage Installation Process
Stormwater has to be sized for the worst day, not the average one. That's the thinking behind every stage of how we design and install these systems.
Site and runoff assessment — we measure your roof area and hard surfaces to work out how much water the system has to shift.
Design and pipe sizing — pipe diameters, gradients and pit locations are set so the system copes with heavy rain, not just a shower.
Council requirements — we confirm the connection point and any consent or compliance requirements before work starts.
Trenching — trenches are dug to the depths and falls the design calls for, working around existing services.
Pipes, pits and sumps — pipework, cesspits and sumps go in bedded correctly, with access points where you will actually need them.
Connection, testing and reinstatement — we tie into the network, test the system under flow, then backfill and reinstate the surface.