Our Retaining Wall Excavation Process
Wall excavation isn't just a trench on a line. It has to leave room for the footing, the drainage layer and the backfill, and it has to stay stable while the wall goes up.
Wall setout — we mark the wall line and check it against boundaries, services and the levels either side.
Excavation profile — the dig is sized for the footing width plus the drainage and backfill zone behind the wall, not just the wall itself.
Footing trench — we dig the footing to the depth the design calls for and trim the base flat and firm.
Cut face stability — the excavated face is battered or supported so it stays safe while the crew builds the wall in front of it.
Base preparation — the founding level is compacted and checked, because a soft spot under a footing shows up as a crack later.
Handover to the build — we leave working room and access so the wall crew can get on with it straight away.