Our Concrete Sleeper Wall Installation Process
Sleeper walls live or die on the posts. Get the post holes deep enough and concreted properly and the wall will still be dead straight in twenty years. Here's how we build them.
Setting out — we mark the wall line and set post spacings to suit the sleeper length and the load behind the wall.
Post holes — holes are bored to a depth matched to your retained height, which is usually deeper than people expect.
Post installation — steel or concrete posts go in plumb and are concreted in, then left to cure before anything loads them.
Sleeper placement — sleepers drop into the post channels one course at a time, checked for level as the wall goes up.
Drainage — drainage metal and a base pipe go in behind the wall so water leaves the site instead of pushing on the sleepers.
Backfill and finishing — we backfill in compacted layers and tidy the ground either side of the finished wall.